Section 01

System overview

What is installed, what does it cover and who owns each duty?

Understand the system boundary, normal and degraded state, interfaces and who is responsible before acting.

01 of 09

Sample imagery

The building this manual covers

Imagery on this sample is either the sample building or a drawing the manual itself contains.

Exterior of the fictional block of flats this sample manual covers
The fictional sample building - not a real installation

Before you act

What you need to know

Purpose and system boundary

This fictional manual covers the Block A water-safety system records. It excludes the incoming utility service, building electrical distribution and water-damage repairs.

Normal and degraded state

Normal means the recorded local indication, available flow and valve state agree with the current project schedule.

Any abnormal or absent indication, uncertain valve state or repeated alarm is degraded. Use local evidence and escalate uncertainty.

Leak-detection system boundary

The leak-detection system monitors water flow, can identify a potential leak and can close an isolation valve.

Source: EB-LD-UM pp. 2-3

Project schedules

The recorded detail

Open any row to see its full detail.

Final installed scope, exclusions and interfacesSchedule 01 of 0411 rows6 columns
Final installed scope, exclusions and interfaces
System or work itemFinal installed scopeExcluded from this contractAssumptionInterface with othersEvidence
Project sensing-point and isolation records12 project assets installed and labelledBuilding fabric beyond local accessAccessible cupboards assumedExample Installer with fit-out contractorProject asset register and certificate
Flat-level access and making goodAccess openings at listed cupboardsDecorative finishes beyond local making goodClear access retainedFit-out contractorEB-A-GF-01
Riser pipeworkRiser 1 and Riser 2 isolation branchesIncoming utility serviceExisting main serviceablePlumbing contractorEB-A-WS-02
Electrical spur and control cableLocal fused spurs and control cableUpstream distribution boardSafe supply availableElectrical contractorControlled technical documents
Project record distributionCurrent asset registerPersonal device supportControlled issue remains availableBuilding operatorHandover record
Project sensing-point to isolation relationshipsRelationships listed in EB-WS-SCH-01Unrecorded hardware topologyRelationship remains within the listed project zoneExample InstallerEB-A-CS-03
Commissioning and witness recordsTrip, close and pressure-hold project recordsFuture seasonal re-verificationSafe test method is separately controlledExample Installer and client representativeEB-A-COMM-014
Periodic project checksPlanned project checks in this manualReactive repair after damageAccess remains clearBuilding operator and maintainerMaintenance schedules
Visible identity and condition recordsMonthly safe visual record checkProduct-specific actuation or control testingVisible identity and condition onlyBuilding operatormonthly-project-record-check
Water-damage making goodNot includedAll water-damage finishes and contentsIncident area made safe firstClient-appointed contractorOutstanding-works schedule
Plant-room incoming-main operationProject isolation valve supplied and labelledRoutine operation by residentsDirection from competent authorityBuilding operator and competent responderEB-A-WS-02
Lifecycle responsibilitiesSchedule 02 of 0411 rows6 columns
Lifecycle responsibilities
System or work itemDesign and supplyInstall and commissionOperate and maintainWarrantyEmergency escalation
Project sensing-point and isolation recordsExample InstallerExample InstallerBuilding operatorProject evidence only - no manufacturer warranty claim24 hour line
Flat-level access and making goodFit-out contractorFit-out contractorBuilding operatorFit-out contractorBuilding manager
Riser pipeworkPlumbing contractorPlumbing contractorExample InstallerPlumbing contractor24 hour line
Electrical spur and control cableElectrical contractorElectrical contractorCompetent electricianElectrical contractor24 hour line
Project record distributionBuilding operatorBuilding operatorBuilding operatorNot applicable - project record distributionFront desk
Project sensing-point to isolation relationshipsExample InstallerExample InstallerExample InstallerProject evidence only - no product compatibility claim24 hour line
Commissioning and witness recordsExample InstallerExample InstallerExample InstallerProject evidence only - no manufacturer warranty claimTechnical support
Periodic project checksExample InstallerBuilding operatorBuilding operator and Example InstallerProject evidence only - no manufacturer warranty claimTechnical support
Visible identity and condition recordsBuilding operatorBuilding operatorBuilding operatorNot applicable - safe visual project checkTechnical support
Water-damage making goodClient-appointed contractorClient-appointed contractorClientNot applicable - outside system recordBuilding manager
Plant-room incoming-main operationExample InstallerExample InstallerCompetent responder onlyProject evidence only - no manufacturer warranty claim24 hour line
Known limitations and outstanding works at issueSchedule 03 of 043 rows6 columns
Known limitations and outstanding works at issue
IDItem and affected areaOperational impactSafe workaroundOwner and target dateStatus and closure evidence
OL-01Seasonal re-verification - Riser 2No current impact - planned verification, not incomplete commissioningUse current commissioned baselineExample Installer - 2026-12-15Planned - retain re-verification record
OL-02Captive fixings to Flat 16 access panelAccess panel finish only - isolation unaffectedBuilding operator retains normal cupboard accessFit-out contractor - 2026-07-15Open non-critical - fitting record
OL-03Controlled record distribution for unoccupied flatsNo remote project record access - local automatic isolation unaffectedUse local project evidence and front desk routeBuilding operator - on occupationPlanned non-critical - distribution record
Handover and training recordSchedule 04 of 045 rows6 columns
Handover and training record
Role or audienceTopicMethod and trainerDateEvidence and acknowledgementRefresher trigger
Building manager and front deskAlarm recognition and escalationBriefing and demonstration - Example Installer2026-06-12Attendance record and verbal acknowledgementContact or procedure change
Maintenance contractorProject isolation, checks and evidencePractical demonstration - Example Installer2026-06-12Task walk-through recordAnnual service or equipment change
Residents of Flats 12-20Permitted response and stop boundariesResident card briefing - building manager2026-06-13Distribution and acknowledgement recordNew occupier or alarm event
Out-of-hours responderZone route and 24 hour escalationScenario briefing - Example Installer2026-06-12Scenario recordRoster or procedure change
Client and facilities ownerResponsibilities, evidence and limitationsHandover review - Example Installer2026-06-14Review acknowledgement - not formal acceptanceManual revision or open-item closure